Skip to content

Glossary

Overview

The words used across this manual that are not obvious from everyday speech. Read it once before you start; it will save you asking.

Every page here links to this glossary the first time it uses a term. If a word is unfamiliar, it is probably in this list.

Access

Reference → Glossary

Screen

No screen — this is a word list.

Main Features

Containers and Freight

Term Meaning
FCL Full Container Load — one shipper's goods fill the container
LCL Less than Container Load — shared with other shippers
TEU / FEU Twenty-foot / forty-foot equivalent unit — how containers are counted
Container number The ID printed on the container, e.g. MSCU1234567. Always read it off the box
Seal A numbered lock that proves the container has not been opened
Seal number The number on that lock. If it is broken or differs, stop and report
Booking The agreement to carry a shipment: shipper, carrier, when, which vessel
Cut-off The latest time a booking or container can be accepted for a sailing. After it, it misses the vessel
ETD / ETA Estimated Time of Departure / Arrival
Demurrage Charge for a container that stays too long at the terminal
Detention Charge for a container held too long outside the terminal

Weight and Quantity

Term Meaning
Gross The vehicle loaded
Tare The vehicle empty
Net The difference — the goods' weight. Not always auto-calculated; check it
VGM Verified Gross Mass — the declared total container weight, verified before loading
MT / LT / ST Metric ton / Long ton / Short ton — different units, different conversions
Bale A compressed bundle of material, the unit stock is tracked in

Stock and Records

Term Meaning
Lot A tracked batch of stock. Every lot has a balance and a location
Allocation Stock committed to an order so it cannot be used twice
Inbound Goods arriving
Outbound Goods leaving
Transload Goods moved between loads, often without returning to a terminal
Chassis The wheeled frame a container sits on
Pickup / Drop-off Where a container is collected, and where it is delivered

Documents

Term Meaning
BOL Bill of Lading — the shipping document listing what is on the load
POD Proof of Delivery — signed when the load arrives
ASN Advance Shipping Notice — sent ahead so the terminal expects a container
EDI The electronic messages terminals use to receive and release containers
Detention free days Days a container may sit free before charges start

System Terms

Term Meaning
DIP Dock In Plan — the morning plan of what arrives early and goes to which dock
Complete Without Scale Receiving a load that is not physically weighed
Finalize The step that turns a weighed load into stock. Weighing is not finalizing
QBO QuickBooks Online — the accounts system invoices go to
A/R, A/P Money owed to us / money we owe
Margin What is billed minus what it cost

Fields

Field Why it matters
Unit Decides the conversion and the formula
Cut-off date Missing it loses the vessel
Seal number Proves the container was not opened

Status

Terms here are not statuses. For what each screen's states mean, open that screen's page.

Notes

  • Demurrage and detention are different charges and both cost real money. Know which one you are looking at.
  • Gross and tare are not guaranteed to subtract to net. Always confirm the net figure.
  • If a term is not here, ask — a missing word in the manual is a gap we should fix.