Legacy Input Assimilation And Reconstruction Index¶
The current specifications are in Development specifications, the method for reconstructing work is in Reconstruction standard, and progress is tracked in the Tasks. This index is the entry point for finding investigation sources.
Source-Reconciled Contract Index¶
| Work and material | Source | Structured relation |
|---|---|---|
| Ocean Booking: C1 Legacy, C2 reference, native reconciliation | Ocean Booking reconciliation | booking |
| Booking adapter and caller | BOOKING_CURRENT_ADAPTER_AND_CALLER_MAP.md | Caller map for the observed revision |
| Booking/source linkage | BOOKING_SOURCE_LINKAGE_SOURCE_RECONCILED.md | booking |
| Tenant, Role, Platform | PLATFORM_TENANT_ROLE_SOURCE_RECONCILED.md | platform/intake |
| Commercial Agreement and Service intake | COMMERCIAL_AND_SERVICE_INTAKE_SOURCE_RECONCILED.md | platform/intake |
| Master data | MASTER_DATA_SOURCE_RECONCILED.md | master/settlement |
| Receipt, Lot, Ledger, Placement | INVENTORY_RECEIPT_LOT_PLACEMENT_SOURCE_RECONCILED.md | inventory |
| Allocation | INVENTORY_ALLOCATION_SOURCE_RECONCILED.md | inventory |
| Transload and Assignment | OPERATIONS_TRANSLOAD_ASSIGNMENT_SOURCE_RECONCILED.md | operations/scale |
| Scale and Weight | SCALE_WEIGHT_SOURCE_RECONCILED.md | operations/scale |
| Transportation, Yard, Equipment | TRANSPORTATION_YARD_EQUIPMENT_SOURCE_RECONCILED.md | transport/equipment |
The material above is a source reconciliation against the stated revision. Approved target contracts and real role, DB and provider acceptance are confirmed in each specification and in the execution evidence. The basis of C1 Legacy and that of C2 reference/native do not substitute for each other.
Dated Reconstruction And Decision Inputs¶
| Record | Preserved content and links |
|---|---|
| Initial source classification and investigation results | NS0-003 initial input disposition, 2026-08-15 Wave 1–5 results — the separate input ledger and checkpoints are merged into the owning Task |
| 2026-09-06–07 implementation and follow-up investigation | NEW_SYSTEM_WORK_PROCESS_IMPLEMENTATION_BASELINE.md — command, UI and follow-up packet results merged into one record; related execution records are in NS3-112 |
| Initial UX to Process handoff | NS0-002_TO_NS0-003_HANDOFF.md — the UI questions and Process inputs of that time |
| Booking source provenance | NS0-003_BOOKING_SOURCE_REGISTRY.md — the original revision and checksum |
| Booking UI reconciliation | NS0-003_BOOKING_UI_RECONCILIATION_MANIFEST.md — initial screens and source relations |
| First open decisions and unknowns | NS0-003_OPEN_DECISIONS_AND_UNKNOWNS.md — past questions to be read together with the later decisions |
| Transportation UI reconciliation | NS0-003_TRANSPORTATION_UI_RECONCILIATION_MANIFEST.md — initial transport/UI basis |
| Visual and motion input | NS0-003_VISUAL_QUALITY_AND_MOTION_INPUT.md — the references and reasons at the time; the current appearance baseline is DESIGN/UI Foundation |
The results and limits of each dated source are limited to the scope it had. The original text of the merged input ledger, checkpoints and follow-up notes is linked at each merge point as an immutable Git revision. Do not use them as the current execution order or as a re-approval.
Source:
new-system/docs/reconstruction/README.md— ctc repository · This page is an English translation of the source document. Identifiers, file paths and code symbols are unchanged.